Adani Electricity Mumbai (AEML) has invited bids to procure 500 MW/4,000 MWh of energy storage capacity along with an additional 250 MW/2,000 MWh under greenshoe option from pumped hydro storage projects (PSP) or battery energy storage systems. Bids must be submitted by July 1, 2025. Bids will be. As India enters 2026, the renewable energy landscape stands at a decisive inflection point. With policy continuity, rising investor confidence, and accelerating. ENGIE has been awarded its first hybrid project in India, combining 200 MW of solar PV with 100 MW / 600 MWh of battery storage. Over 60% o Mumbai, India's financial capital, faces dual challenges: rising electricity demand and aging grid infrastructure. The distributed. The report notes that as of December 31, 2025, India has 10 PSPs with an installed capacity of 7 GW in operation, while 10 PSPs with a total capacity of 12 GW are under construction. India has a very large potential for Pumped Storage Projects (PSPs) across both on-river and off-river schemes.